Curing dead zones in lower part column

Brine removal after resin regeneration was calculated and optimised. The density of the brine solution is much higher than that of water. In the original configuration, brine severely interfered during operation after regeneration. Different geometrical adaptations were tested. The period of salt flushing out could be significantly shortened.

Evides industriewater logo

Major findings

  • Lower part of column contained dead zones
  • Brine washed out slowly during normal operation
  • The implemented geometrical improvements significantly lowered the impact of brine